Who
APUA
What
Coordination and supervision of all refurbishment and commissioning works.
When
2017
Where
Antigua and Barbuda
Systems
36 MW Thermal
Type
HFO
Telefone: +351 987 654 321
Email: teste@winpower.com
Wadadli power plant is the main electrical generation center of Antigua and Barbuda. However, in a state of total inoperability. As a result, the local government launched a public initiative to supervise the repair and refurbishment works that were required to put it back in operation – in an initial stage, at 50% of its nominal capacity.
At the same time, the public initiative also find the need to provide the power plant owner all the required support, advice and guidance to implement the recovery, refurbishment and re-commissioning of Wadadli Power Plant.
WinPower provided the expertise and Technical Assistance (TA) for the supervision of the refurbishment, recovery works and the commissioning of 3x generator sets, alongside their required auxiliary systems.
Who
APUA
What
Coordination and supervision of all refurbishment and commissioning works.
When
2017
Where
Antigua and Barbuda
Systems
36 MW Thermal
Type
HFO
Full Technical Assistance (TA) services provided by WinPower lead to a 50% nominal capacity operation of the power plant. Results were achieved by:
Energy solutions designed and engineered by a team of experienced experts in the field.
Fogo Island, Cape Verde
Part of Cape Verde’s ongoing investment plans to enhance energy [...]
Boavista, Cape Verde
Green, reliable, and affordable energy is one of the sustainable drivers solving [...]
The project was the result of the Portuguese ongoing investment plans [...]