Who
Construtora S. José
What
Technical and Economic Feasibility Study
When
2017
Where
Boavista Island, Cape Verde
Systems
9 MW Thermal & 300 kW PV
Type
Hybrid Power Plant Thermal & PV
Telefone: +351 987 654 321
Email: teste@winpower.com
Green, reliable, and affordable energy is one of the sustainable drivers solving the energy needs of touristic investments, all around the world. In more remote islands such as the Boavista Island in Cape Verde this is of special importance.
WinPower developed the technical and economic feasibility studies for a new Hybrid, Thermal & PV, Power Plant. These studies combined the need for reliable, stable, and affordable energy, together with local climate and island existing infrastructures, required for the foreseen upcoming tourist investment of the Porto Santa Monica Resort.
Technical and Economic Feasibility Study of three possible configurations for a new Hybrid, PV, and Thermal Power Plant. The studies performed took into consideration:
Who
Construtora S. José
What
Technical and Economic Feasibility Study
When
2017
Where
Boavista Island, Cape Verde
Systems
9 MW Thermal & 300 kW PV
Type
Hybrid Power Plant Thermal & PV
WinPower delivered a full Technical and Economic Feasibility Study to support the decision making process, concerning the energy generation solution for the new Porto Santa Monica Resort, in Boavista Island, Cape Verde.
Energy solutions designed and engineered by a team of experienced experts in the field.
Fogo Island, Cape Verde
Part of Cape Verde’s ongoing investment plans to enhance energy [...]
Boavista, Cape Verde
Green, reliable, and affordable energy is one of the sustainable drivers solving [...]
The project was the result of the Portuguese ongoing investment plans [...]